← Back to Calculators
Calculate Fill Dirt Slope Icon

Calculate Fill Dirt Slope

Master slope calculations for grading projects. Calculate triangular slope volumes, understand compaction on angles, and order the exact amount needed.

Pro Fill Dirt Calculator

Accurate estimates for Yards, Tons, & Compaction

15%
0%15% (Rec.)30%

Results

AI Calculation
Coverage Area100 sq ft
Volume (Cubic Feet)25 cu ft
Volume (Cubic Yards)0.93 yds³
Est. Amount (Pounds)2,222 lbs
Est. Amount (Tons)1.11 tons
Est. Amount (Kg)1,008 kg
RECOMMENDED
Amount + 15% Compaction
1.06
Cubic Yards
1.28
Est. Tons

How to Calculate for Calculate Fill Dirt Slope

The Formula

(Run × Width × Rise) ÷ 2 = Cubic Feet

To calculate fill dirt for slopes, use the triangular prism formula: multiply horizontal run, width, and vertical rise, then divide by 2. This gives cubic feet. For example: 40 ft run × 20 ft wide × 6 ft rise ÷ 2 = 2,400 cubic feet. Add 20-25% for compaction on slopes.

1

Measure Accurately

Measure in feet. For depth, measure in inches and our tool handles the conversion (divide by 12).

2

Check Your Shape

Most slope projects are areas. If irregular, break it into smaller shapes.

3

Add Compaction

Slope calculations are more complex than flat fills due to triangular geometry, gravity-affected compaction, and erosion concerns. Small errors in slope measurements result in major volume miscalculations and costly material shortages or overages.

Calculate Fill Dirt Slope: The Complete Guide to Grading & Hillside Projects (2025)

Have you ever stood at the bottom of a sloped yard, tape measure in hand, trying to figure out how to calculate how much dirt you need to fill a slope? You're definitely not alone! Slope calculations can feel intimidating, but they're absolutely essential for any grading project.

Here's a story that'll make you understand why getting this right matters: Last summer, a contractor friend of mine bid on a residential slope grading job. He eyeballed the slope angle and estimated "about 15 cubic yards" of fill dirt. Turns out the actual slope was steeper than he thought – he ended up needing 28 cubic yards. That miscalculation cost him over $1,200 in unexpected material costs plus another delivery fee, not to mention the project delay.

⚠️

The Slope Calculation Mistake

Slopes are deceptive! A yard that looks "gently sloping" can require 50-100% more fill dirt than you'd guess. The angle makes all the difference – a 15-degree slope uses substantially more material than a 5-degree slope over the same horizontal distance.

But here's the good news: with the right approach and our free fill dirt calculator slope tool, you can calculate fill dirt slope requirements with precision. This guide will walk you through everything – from understanding slope terminology to executing complex multi-level calculations.

Understanding Slopes for Fill Dirt Projects

Before we dive into calculations, you need to understand what we're actually measuring when we talk about slopes. Trust me, this foundation will make the math way easier!

What is Slope Angle vs. Slope Grade?

📐 Slope Angle (Degrees)

The actual angle of the slope measured from horizontal. Ranges from 0° (flat) to 90° (vertical cliff).

  • • 0-5°: Nearly flat (subtle drainage)
  • • 5-15°: Gentle slope (comfortable walking)
  • • 15-30°: Moderate slope (challenging terrain)
  • • 30-45°: Steep slope (requires care)
  • • 45°+: Very steep (needs retaining walls)

📊 Slope Grade (Percentage)

Expresses slope as a percentage based on rise over run. Commonly used in grading plans.

  • • 2%: Minimum for drainage (1:50 ratio)
  • • 5%: Comfortable lawn slope
  • • 10%: Noticeable incline
  • • 25%: Steep grade
  • • 50%: Very steep (27° angle)

🔄 Quick Conversion Reference

Percentage = tan(Angle in Degrees) × 100

Don't worry – our fill dirt calculator slope tool does all these conversions automatically!

How to Calculate Fill Dirt for Slopes

Measuring Slope Dimensions Accurately

📏

Horizontal Run

The flat distance from top to bottom of the slope

📐

Vertical Rise

The height difference from bottom to top

↔️

Width

How wide the slope area is (perpendicular to run)

Triangle and Wedge Volume Formulas

The Master Slope Fill Formula

Volume (cubic feet) = (Run × Width × Rise) ÷ 2

This gives you the volume of a triangular wedge!

Why divide by 2? Because we're calculating a triangle (wedge shape), not a rectangle.

Step-by-Step Calculation Examples

1

Example: Backyard Slope Grading

Project: Leveling a sloped backyard. Run: 50 ft, Width: 30 ft, Rise: 8 ft

Step 1: Apply formula = (50 × 30 × 8) ÷ 2

Step 2: Calculate = 12,000 ÷ 2 = 6,000 cubic feet

Step 3: Convert = 6,000 ÷ 27 = 222 cubic yards

Step 4: Add 20% buffer = 222 × 1.20 = 267 cubic yards

✓ Order: 270 cubic yards of fill dirt

2

Example: Driveway Approach

Project: Driveway to street. Run: 24 ft, Width: 12 ft, Rise: 3 ft

Volume = (24 × 12 × 3) ÷ 2 = 432 cubic feet

Cubic yards = 432 ÷ 27 = 16 cubic yards

With buffer = 16 × 1.20 = 19.2 cubic yards

✓ Order: 20 cubic yards

Fill Dirt Calculator Slope Tools

✅ Online Calculator Benefits

  • • Handles complex slopes automatically
  • • Zero math errors
  • • Unit conversions built-in
  • • Instant compaction buffer added
  • • Multiple output formats

📱 Manual Calculation Uses

  • • On-site without internet
  • • Double-checking calculator results
  • • Teaching the concepts
  • • Quick rough estimates

Common Slope Fill Scenarios

Grading for Drainage

Recommended slope: 2-5% grade (1-3 degrees) for proper drainage away from foundations.

Retaining Wall Backfill

Backfill behind walls with 2-3% slope toward drainage. Compact in 6-inch lifts. Use our retaining wall calculator for specific backfill volumes.

Driveway Approaches

Residential max: 15% (8-9 degrees). Comfortable range: 8-12% (4-7 degrees).

Compaction Requirements on Slopes

Slope compaction is more challenging than flat ground. For detailed compaction calculations, visit our compacted fill dirt calculator.

✓ Professional Slope Compaction Process

  1. 1.Use 4-6 inch lifts (thinner than flat fills)
  2. 2.Compact perpendicular to slope, not up and down
  3. 3.Make 3-5 passes minimum per lift
  4. 4.Check moisture before each lift
  5. 5.Add erosion control immediately after

Cost Estimation for Slope Projects

🌱

Gentle Slopes (0-15°)

$12-$30

per cubic yard

⚖️

Medium Slopes (15-30°)

$18-$45

per cubic yard

🏗️

Steep Slopes (30°+)

$25-$60+

per cubic yard

Safety Considerations on Slopes

⚠️ CRITICAL SAFETY RULES ⚠️

  • 1.Know your equipment's safe operating angle (skid steers: 15-20°, excavators: 20-25°)
  • 2.Always work uphill, never downhill from equipment
  • 3.Use spotters on steep slopes
  • 4.Wear proper PPE: hard hat, steel-toe boots, high-vis vest
  • 5.Don't work in wet conditions – slopes become exponentially more dangerous

Professional Tips for Slope Projects

🌟 Insider Secrets from the Pros

The 20% Slope Rule

Always add 20% to your calculated volume for slopes. This covers compaction settlement, waste, and measurement errors.

Compact Uphill

Move your compactor from bottom to top. This pushes material uphill as you compact, counteracting gravity.

Temporary Erosion Control

Install silt fencing at the bottom BEFORE you start filling. Protects against unexpected rain.

Check Local Codes

Many areas have maximum slope regulations. A $100 permit is cheaper than tearing out non-compliant work!

Conclusion: Mastering Slope Calculations

You've now got all the knowledge you need to accurately calculate fill dirt for slopes. Remember the key formula:

(Run × Width × Rise) ÷ 2 = Cubic Feet

Then divide by 27 to get Cubic Yards and add 20-25% for slopes!

Use our free fill dirt calculator slope tool at the top of this page for instant, accurate results. No signup required!

Frequently Asked Questions

How do I calculate fill dirt for a sloped yard?

Measure the horizontal run, vertical rise, and width of the slope. Use the formula: (Run × Width × Rise) ÷ 2 = Cubic Feet. Then divide by 27 to convert to cubic yards. Add 20-25% for compaction buffer.

What's the difference between slope angle and grade?

Slope angle is measured in degrees (0-90°), while grade is expressed as a percentage based on rise over run. A 10% grade means 10 feet of rise per 100 feet of run.

How much fill dirt do I need for a 10-degree slope?

It depends on your run and width! For example, a 10-degree slope over 30 feet of horizontal run has a rise of about 5.3 feet. If it's 20 feet wide: (30 × 20 × 5.3) ÷ 2 = 1,590 cubic feet = 59 cubic yards.

Can I use regular fill dirt on steep slopes?

Yes, but slopes over 25 degrees should use clay-rich fill dirt with good compaction properties. Avoid sandy fill on steep slopes as it's more prone to erosion.

What is the maximum safe slope for fill dirt?

For uncompacted fill, 33% grade (about 18 degrees) is generally the maximum without structural support. With proper compaction, slopes up to 50% (27 degrees) can be stable.

How do you calculate triangular slope volume?

Use: Volume = (Run × Width × Rise) ÷ 2. The '÷ 2' is critical because you're calculating a triangular prism, not a rectangular box.

Do slopes require more fill dirt than flat areas?

For the same horizontal area, yes! A sloped fill uses more material because you're filling a 3D wedge. Plus, slopes need 20-25% compaction buffer vs. 15% for flat.

How much does slope affect fill dirt costs?

Gentle slopes (0-15°): $12-$30/cubic yard. Medium slopes (15-30°): $18-$45/cubic yard. Steep slopes (30°+): $25-$60+/cubic yard.

What tools do I need to measure a slope?

Essential tools: 100ft tape measure, laser level or transit for elevation changes, stakes and string line, smartphone level app, and notebook/camera.

How do I prevent erosion on filled slopes?

Immediate seeding within 24-48 hours, erosion blankets for slopes over 20 degrees, and proper drainage to direct water away from the slope.

Should fill dirt be compacted on slopes?

Absolutely essential! Use 4-6 inch lifts (thinner than flat fills). Compact perpendicular to the slope direction. Make 3-5 passes minimum per lift.

What's the best slope for drainage?

For residential drainage: 3-5% grade (2-3 degrees) is ideal. Minimum for water flow: 2%. Beyond 10% grade, install erosion control.

How do I calculate fill for a retaining wall?

Retaining wall backfill is rectangular: Length × Width × Height = Cubic Feet. Include 12 inches of gravel drainage behind the wall.

Can I fill a slope without a retaining wall?

Grades up to 33% (18 degrees) can often be filled without retaining walls if properly compacted and vegetated. Beyond 33% or fills over 3-4 feet, walls are needed.

What is the formula for calculating slope fill dirt?

Core formula: (Run × Width × Rise) ÷ 2 = Cubic Feet. Convert: Cubic Feet ÷ 27 = Cubic Yards. Add 20-25% for compaction.