← Back to Calculators
🕳️

How to Calculate Dirt for Holes

Master fill dirt calculations for any hole shape. Step-by-step formulas, worked examples, and expert tips for rectangular, circular, and irregular holes.

Pro Fill Dirt Calculator

Accurate estimates for Yards, Tons, & Compaction

15%
0%15% (Rec.)30%

Results

AI Calculation
Coverage Area100 sq ft
Volume (Cubic Feet)25 cu ft
Volume (Cubic Yards)0.93 yds³
Est. Amount (Pounds)2,222 lbs
Est. Amount (Tons)1.11 tons
Est. Amount (Kg)1,008 kg
RECOMMENDED
Amount + 15% Compaction
1.06
Cubic Yards
1.28
Est. Tons

How to Calculate for How to Calculate Dirt for Holes

The Formula

(L × W × D) ÷ 27 = Cubic Yards

Measure Length, Width, and Depth in feet. Multiply to get Cubic Feet. Divide by 27 for Cubic Yards. Always add 10-15% for compaction.

1

Measure Accurately

Measure in feet. For depth, measure in inches and our tool handles the conversion (divide by 12).

2

Check Your Shape

Most how to-calculate-how-much-dirt-to-fill-a-hole projects are rectangles. If irregular, break it into smaller shapes.

3

Add Compaction

Accurate fill dirt calculations prevent costly over-ordering or project delays from running short. This guide covers every hole shape and accounts for the critical compaction factor that most DIYers miss.

Figuring out exactly how much dirt you need can feel overwhelming, especially when you're staring at an empty hole in your yard. Whether you're filling a post hole, leveling your lawn, or handling a major landscaping project, getting the calculation right matters. Order too little and you'll face delays and extra delivery fees. Order too much and you're stuck with piles of excess dirt and wasted money.

Learning how to calculate how much dirt to fill a hole doesn't require advanced math skills or engineering knowledge. With the right approach and basic measurements, you can determine the exact amount of fill dirt you need in just a few minutes. This guide walks you through every step of the calculation process, from understanding cubic yards to handling irregular shapes and accounting for soil compaction.

Throughout this article, you'll discover practical formulas, real-world examples, and professional tips that contractors use daily. By the end, you'll confidently calculate fill dirt requirements for any project size or hole shape.

Understanding Fill Dirt Volume Calculations

Before you grab a tape measure and start calculating, you need to understand a few fundamental concepts. These basics form the foundation of every fill dirt calculation, regardless of your project size.

Why Accurate Calculations Matter

Precision in your calculations directly impacts your project's success and budget. When you underestimate the amount of dirt needed, work stops while you wait for additional delivery. That delay might mean days of staring at an unfinished yard, especially if your supplier has limited availability.

Overestimating creates different problems. Excess fill dirt clutters your property and disposal can cost as much as the original purchase. Many homeowners underestimate disposal challenges until they're facing a mountain of leftover soil with nowhere to put it.

Cost considerations extend beyond the dirt itself. Delivery fees typically apply per trip, not per cubic yard. A second delivery doubles that expense. Most suppliers charge between fifty and one hundred fifty dollars for delivery, making accuracy financially important.

Professional contractors know that proper calculations also prevent settling issues. When you account for compaction from the start, you avoid the frustration of watching your carefully filled area sink and require additional material weeks later.

Basic Concepts You Need to Know

Fill dirt is sold by volume, not weight. Understanding volumetric measurement helps you communicate clearly with suppliers and avoid confusion when placing orders.

What is a Cubic Yard?

A cubic yard represents a cube measuring three feet on each side. Length, width, and height all equal three feet, creating a total volume of twenty-seven cubic feet. This standardized measurement allows suppliers to price and deliver materials consistently across the industry.

Visualizing a cubic yard helps many people grasp the concept. Picture a washing machine or a medium-sized refrigerator. That's roughly one cubic yard of volume. When dealing with fill dirt, one cubic yard covers approximately one hundred square feet at a depth of three inches.

Cubic Feet vs. Cubic Yards

You might naturally measure in feet since tape measures use this unit. Calculations begin in cubic feet, then convert to cubic yards for ordering. The conversion factor stays constant: divide cubic feet by twenty-seven to get cubic yards.

This two-step process seems unnecessary at first, but it aligns with how the industry operates. Delivery trucks measure capacity in cubic yards. Price quotes list dollars per cubic yard. Keeping these units consistent prevents ordering errors. Use our cubic yards calculator for easy conversion.

Understanding Soil Compaction

Freshly delivered fill dirt contains air pockets and hasn't experienced the compression that occurs when it settles into place. Over time, the weight of the soil itself, along with rain and gravity, compacts the material and reduces its volume.

Most fill dirt compacts between ten and twenty percent after placement. Clay soils compress more than sandy soils due to their particle structure. This means you always need more cubic yards than your basic calculation suggests.

Professional landscapers build this compaction factor into every estimate. Adding ten to fifteen percent extra ensures your filled area reaches the desired final elevation even after settling occurs.

Understanding Soil Compaction & Settlement

Essential Tools for Measuring Your Hole

Accurate measurements require the right tools and techniques. You don't need expensive equipment, but having appropriate measuring tools makes the job easier and more precise.

Measurement Tools You'll Need

A quality tape measure serves as your primary tool. Choose one that extends at least twenty-five feet, though fifty-foot models offer more versatility for larger projects. Steel or fiberglass tapes work well outdoors and resist damage from moisture or sun exposure.

Bring a notepad and pencil to record measurements immediately. Your phone's note app works too, but traditional paper survives dusty outdoor conditions better. Write down each measurement with clear labels so you don't confuse length, width, and depth later.

A long straight board or level helps when measuring irregular depths. Place it across the top of the hole and measure straight down at multiple points. This technique works especially well for holes with uneven bottoms.

String and stakes assist with very large or irregular areas. Mark the perimeter with string, then break the space into manageable rectangular or triangular sections. This divide-and-conquer approach simplifies complex calculations significantly.

How to Take Accurate Measurements

Start by identifying your hole's shape. Rectangular, square, and circular holes use different formulas, so proper shape identification prevents calculation errors before they happen.

For rectangular holes, measure both the length and width at the top of the hole. If your hole has sloped sides, take additional measurements at the bottom. Use the average of top and bottom measurements for the most accurate volume calculation.

Depth measurement requires special attention because it varies more than people expect. Push your tape measure down to the very bottom of the hole at three or four different spots. Record each depth separately, then calculate the average. This average depth accounts for irregular hole bottoms that rarely lie perfectly flat.

For irregular shapes, take photos from directly above if possible. These aerial views help you visualize how to divide the space into regular geometric shapes later. Sketch the outline on your notepad and label each section with its measurements.

Digital Tools and Apps That Can Help

The calculator embedded on this page accepts measurements in various units and performs conversions automatically. You can switch between feet, inches, meters, and centimeters without manual conversion math.

Spreadsheet programs like Excel or Google Sheets let you create reusable calculation templates. Input your measurements once, and the spreadsheet applies formulas automatically. These templates prove especially valuable if you're calculating multiple areas or comparing different fill scenarios.


Step-by-Step Guide to Calculate Dirt for Rectangular Holes

Rectangular holes are the most common shape for fill dirt calculations. They're also the easiest to measure and calculate, making them an ideal starting point for understanding the entire process.

Measuring a Rectangular Hole

Begin at one corner of your rectangular hole and extend your tape measure to the opposite corner along the length. Record this measurement in feet. If your tape shows feet and inches, convert the inches to decimal feet by dividing by twelve.

Next, measure the width perpendicular to your length measurement. Again, record in feet with decimal conversions for any partial foot measurements.

Double-check your measurements before proceeding to calculations. Measurement errors multiply during the calculation process, so spending an extra minute verifying numbers saves trouble later.

The Rectangle Volume Formula Explained

Calculating volume for a rectangular hole requires multiplying three dimensions: length times width times depth. This formula gives you cubic feet, the first step toward determining cubic yards.

Volume (cubic feet) = Length (ft) × Width (ft) × Depth (ft)

This formula works because you're essentially stacking identical layers on top of each other. Each layer's area equals length times width. The depth tells you how many of these layers fill the hole completely.

Worked Example: Rectangular Hole Calculation

Let's walk through a complete example with real numbers. Imagine you've measured a rectangular hole with the following dimensions:

  • Length: 12 feet
  • Width: 8 feet
  • Depth: 2.5 feet (30 inches ÷ 12)

First, multiply length by width by depth:

12 × 8 × 2.5 = 240 cubic feet

Convert to cubic yards:

240 ÷ 27 = 8.89 cubic yards

Add 15% for compaction:

8.89 × 1.15 = 10.22 cubic yards

Order: 10.5 or 11 cubic yards


How to Calculate Dirt for Circular Holes

Circular holes appear in many common projects: flagpoles, fountain bases, tree plantings, and round garden beds. The calculation requires a different formula due to the curved shape.

Understanding Radius vs. Diameter

Diameter measures straight across the circle through its center point. Radius measures from the center to the edge, which is exactly half the diameter. This distinction matters critically because the formula for circular volume uses radius, not diameter.

Once you have the diameter, divide by two to find the radius. Write both numbers down so you don't accidentally use diameter in your formula where radius belongs.

The Circle Volume Formula

Volume (cubic feet) = π × Radius² × Depth

Where π (pi) ≈ 3.14159

Worked Example: Circular Hole Calculation

Consider a circular hole for a fountain base:

  • Diameter: 6 feet (radius = 3 feet)
  • Depth: 2 feet

Apply the formula:

Volume = 3.14159 × 3² × 2 = 56.55 cubic feet

Convert and add compaction:

56.55 ÷ 27 = 2.09 yards × 1.15 = 2.40 yards

Order: 2.5 cubic yards


Calculating Fill Dirt for Other Hole Shapes

Triangular Holes and Wedge Shapes

Triangular holes most commonly appear when filling in areas around diagonal construction, landscape edging, or sloped terrain.

Volume (cubic feet) = (Base × Height × Depth) ÷ 2

Trench Calculations

Trenches are essentially long, narrow rectangular holes. Use the standard rectangular formula: length times width times depth. For trenches with varying depths, measure at multiple points and use the average depth.

The Divide-and-Conquer Method for Complex Shapes

Start by looking at your irregular hole from above. Identify ways to divide it into rectangles, triangles, or circles. Sketch these divisions on paper with clear boundary lines.

Calculate each section separately:

  • Section A (rectangle): 150 cubic feet
  • Section B (rectangle): 80 cubic feet
  • Section C (triangle): 45 cubic feet

Add all sections: 150 + 80 + 45 = 275 cubic feet

Then convert to yards and add compaction factor


Accounting for Soil Compaction and Settlement

Every fill dirt project experiences some degree of compaction after the material is placed. Understanding and planning for this settling prevents disappointing results.

How Much Does Dirt Compress When Filling a Hole?

Compaction rates vary based on soil composition, moisture content, and the amount of force applied during filling. Clay-based fill dirt compacts more than sandy or gravelly material due to the way particles nest together under pressure.

Professional landscapers expect ten to twenty percent volume reduction in most fill situations. Some compaction occurs immediately if you use mechanical tamping or compaction equipment.

Adding the Right Safety Margin

Standard Safety Margins

  • 10% Buffer: For shallow areas or hand tamping
  • 15% Buffer: Standard for most projects
  • 20% Buffer: For deep holes or mechanical compaction

Cubic Yards × 1.15 = Order Amount

Different Compaction Rates by Soil Type

  • Clay soils: 15-20% compaction (highest)
  • Loam: 10-15% compaction (moderate)
  • Sandy fill: 5-10% compaction (low)
  • Gravel/crushed stone: 3-5% compaction (lowest)

Common Mistakes to Avoid When Calculating Fill Dirt

Unit Conversion Errors

Mixing inches and feet in the same calculation produces wildly incorrect results. Convert inches to feet by dividing by twelve. Write your units next to every number: 10 ft, 5 ft, 2.5 ft.

Forgetting to Account for Compaction

First-time fill dirt buyers often calculate the precise volume and order exactly that amount. Then they watch in dismay as the filled area settles several inches below the desired level. Always add your 10-15% compaction safety margin before placing the order.

Measurement Mistakes That Cost You Money

Measuring diameter instead of radius in circular calculations doubles the actual radius value. Since the formula squares the radius, this error quadruples your area calculation. Always double-check which measurement your formula requires.

Choosing the Wrong Type of Dirt

Fill dirt typically contains clay, sand, and subsoil with minimal organic matter. It compacts well and provides structural support. Topsoil contains organic matter and nutrients for plant growth. Use fill dirt for the bulk of your hole and topsoil only for the final surface layer if planting.


Using a How Much Dirt to Fill a Hole Calculator

Benefits of Using an Online Calculator

Calculators eliminate manual arithmetic, which means fewer mistakes from transposed numbers or incorrect decimal placement. Most calculators support multiple measurement units and include compaction factors built into their results.

How to Use Our Fill Dirt Calculator

The calculator embedded at the top of this page guides you through a simple input process. Start by selecting your hole's shape, enter dimensions, choose your measurement unit, and set your compaction factor. The calculator displays cubic feet, cubic yards, and cubic yards including the compaction factor.

Interpreting Your Calculator Results

The cubic yards result tells you how much material to order. Round up to the nearest increment your supplier accepts. Use the cubic feet display to verify your input dimensions make sense.


Planning Your Fill Dirt Project

How Much Does Fill Dirt Cost Per Cubic Yard?

Fill dirt prices range from eight to fifteen dollars per cubic yard in most markets. Screened fill dirt costs more than unscreened material. Topsoil costs significantly more, ranging from twenty to fifty dollars per cubic yard.

Delivery Considerations and Truck Capacity

Delivery fees vary based on distance from the supplier's yard to your property. Expect charges between fifty and one hundred fifty dollars per trip. Confirm access requirements before delivery day. Dump trucks are large vehicles that need adequate clearance and stable ground.

DIY vs. Hiring a Professional

Small to medium projects with straightforward shapes work well as DIY efforts. Large projects covering hundreds of square feet or requiring precise engineering standards benefit from professional assistance.

Consider hiring professionals when:

  • Your project exceeds 50 cubic yards
  • Final elevation must match engineering specifications
  • Local permits require contractor licensing
  • Time constraints prevent DIY work
  • Heavy equipment access is necessary

Conclusion: Master Your Fill Dirt Calculations

Learning how to calculate how much dirt to fill a hole empowers you to tackle landscaping projects with confidence and precision. You now understand the fundamental volume formulas for rectangular, circular, triangular, and irregular shapes.

Accurate measurements form the foundation of successful calculations. Take your time with measuring, use appropriate tools, and double-check dimensions before applying formulas. Remember to convert all measurements to the same unit and distinguish between radius and diameter for circular holes.

The extra ten to fifteen percent you add for compaction isn't waste. It's the difference between a properly filled hole that maintains elevation and a disappointing settling situation that requires additional material and delivery expenses.

Start your next project by carefully measuring your hole's dimensions. Choose the appropriate formula based on shape, perform your calculations with attention to units, add compaction safety margin, and contact local suppliers for quotes. With the knowledge you've gained from this guide, you're ready to order exactly the right amount of fill dirt for any hole-filling project.

Explore More Resources

Frequently Asked Questions

How many cubic feet are in a yard of dirt?

One cubic yard contains exactly 27 cubic feet. This conversion factor comes from the relationship between feet and yards: since one yard equals three feet, a cubic yard measures 3×3×3 feet, which equals 27 cubic feet.

How much does a cubic yard of dirt weigh?

Fill dirt typically weighs between 2,000 and 2,700 pounds per cubic yard when dry. Clay-heavy soil weighs more than sandy soil. Wet dirt can weigh over 3,000 pounds per cubic yard.

Does dirt compact when you fill a hole?

Yes, dirt always compacts after filling. Most fill dirt compacts 10-20% over several weeks or months. This is why you should always order 10-15% more dirt than your raw calculation suggests.

What's the difference between topsoil and fill dirt?

Fill dirt is subsoil with minimal organic matter, ideal for structural support and compaction. Topsoil contains nutrients and organics for plant growth. Use fill dirt for the bulk and topsoil only for the top 6-12 inches where plants grow.

How do I measure an irregular shaped hole?

Divide irregular holes into smaller sections of regular shapes (rectangles, triangles, circles). Calculate volume for each section separately, then add them together for your total cubic feet.

How much extra dirt should I order for compaction?

Order 10-15% more than your calculation. For critical projects, use 15-20%. Multiply cubic yards by 1.10 (10%), 1.15 (15%), or 1.20 (20%). Clay soils need higher margins than sandy soils.

Can I calculate dirt using diameter instead of radius?

Yes. Use the modified formula: Volume = π × (Diameter ÷ 2)² × Depth. This produces the same result as using radius directly because diameter ÷ 2 = radius.

How many wheelbarrows are in a yard of dirt?

A contractor wheelbarrow holds 2-3 cubic feet. Since one cubic yard contains 27 cubic feet, you'll need 9-14 wheelbarrow loads to move one cubic yard.

How deep should fill dirt be placed?

Place fill dirt in 6-12 inch lifts (layers), compacting each layer before adding the next. For shallow fills under 2 feet, you can place the entire depth at once.

Do I need a permit to fill a hole in my yard?

Small residential projects rarely require permits. Larger projects that change drainage patterns, exceed certain volumes, or occur near wetlands often need permits. Contact your local building department before starting.

How long does it take for fill dirt to settle?

Most fill dirt settles significantly within 3-6 months. Initial settling happens within the first few weeks. Gradual settling continues for up to a year, especially with clay-based fills.

What tools do I need to spread fill dirt?

Essential tools: wheelbarrow, square-point shovel, steel rake, and hand tamper or plate compactor. Larger projects benefit from skid steers or compact tractors.

How much does fill dirt delivery cost?

Delivery fees range from $50-$150 per trip depending on distance. Local deliveries (under 10 miles) cost less. Some suppliers offer free delivery for orders above 10 cubic yards.

Can I use excavated dirt to fill a hole?

Excavated dirt works if free from debris and organics. However, excavated topsoil won't compact as well as proper fill dirt. Screen out rocks, roots, and debris before using.

How do I calculate dirt for a sloped hole?

Measure depth at 5+ points across the hole. Add all measurements and divide by the count to find average depth. Use this average in your volume formula.